Most single-suction systems in a basement or slab home finish in one working day. A crawl space membrane adds a second day, and the verification retest afterward runs at least 48 hours once the house has settled.
More detail
The visible work is the short part. Before it, the foundation gets looked at and the sub-slab airflow gets checked, because a suction point placed by guesswork is how a system ends up moving air without moving the number. After the install, the fan runs continuously and the verification test goes out, a minimum of 48 hours under closed-house conditions, performed by a certified measurement professional as Kentucky's law requires for any test done for hire. If a purchase contract is driving the schedule, the whole sequence compresses: scope visit early in the inspection window, install mid-week, retest finishing before the deadline. Say so on the first call and the calendar gets built backward from the date that matters. The real estate service page covers deadline work in detail.